+31 78 65 131 00 Login
DE EN FR NL

Cart

No items in cart

CONSTRUCT Hybrid Fast SL 2-20

Adapt your system

1st moisture barrier primer
Indicate whether a moisture barrier is required. (not on anhydrite)
Primer DPM
None
2nd moisture barrier primer
Primer DPM is applied in two coats.
Primer DPM
None
Primer
Select the desired primer
Primer Universal (undiluted)
Primer GP
Geen
Levelling layer
Hybrid Fast SL 2-20
Choose the desired layer thickness
2 MM
3 MM
4 MM
5 MM
6 MM
7 MM
8 MM
9 MM
10 MM
15 MM
20 MM
Enter how many square meters you want to order:

Your floor

Subfloor
1st moisture barrier primer
2nd moisture barrier primer
Primer
Levelling layer

Hybrid fast-curing levelling compound for layer thicknesses from 2 to 20 mm.

CONSTRUCT Hybrid Fast SL 2–20 is a fast-curing levelling system designed to create a smooth, even substrate in layer thicknesses from 2 to 20 mm. It provides an ideal base for various floor finishes such as Quartzline flooring systems, tiles, floor coverings, and parquet. Suitable for indoor applications on anhydrite, concrete, sand-cement, tiled, and wooden substrates.

Hybrid Fast SL 2–20 is low in shrinkage and stress and easy to sand after hardening. Thanks to its very rapid curing, the floor can be covered after approximately 6 hours. Suitable for use with underfloor heating and in wet areas. Not suitable for industrial applications.

SYSTEM DESCRIPTION

Moisture barrier primer:
For concrete and sand-cement substrates, a maximum residual moisture content of 2.5% CM applies. For residual moisture levels up to 6% CM, apply two coats of Quartzline Primer DPM as a moisture barrier, followed by one coat of Quartzline Primer GP. For anhydrite substrates, a maximum residual moisture content of 0.5% CM applies and a moisture barrier cannot be used.

Primer:
Use Primer GP for non-porous substrates and Primer Universal for porous substrates, diluted at a ratio of 1 part primer to 3 parts water.

Levelling layer:
Hybrid Fast SL 2–20 can be applied in layer thicknesses from 2 to 20 mm.

Ideal for:

  • Fast renovations
  • Fast floor build-up
  • Wet areas
  • Underfloor heating
  • Various substrates

Disclaimer

Despite the fact that this calculation system has been carefully compiled, no rights can be derived from the outcome. These calculations are performed on the basis of a number of general principles. The results of the calculations are only an indication. This is because the applicable circumstances for the project concerned for which the order applies cannot be taken into account.